This is the photo chronology of the trip. There are 6 members in our group, there are Me, Mannju, Apple, Desmond, Miyo, and Vivian. We had spend three days together eat, and sleep, completed the task and play together. During this three days, we had enhance our friendship and we had learn to work as a team.
Day 1 ::
In the bus.
A two clour truck is waiting for us.
They are welcoming us.
They are very cute.
Our room with two double decker bed.
Vivian and miyo sleep on the top, me and mannju sleep at the bottom.
The bed with the window.
Our first lunch at the refreshment trip resort.
Our group members.
In the afternoon, we have started to complete our task that Professor Charles give us and we have to completed it one by one. After we completed one task, we would have our second task.Our first task is to find out what is the name of the witch. But we cannot find the hint about the task, so we had to give a tack to have the hint of the task.
After we completed the task, we have to design the white shirt that we brought. The first think that we have to design is to design our own hero logo on our shirt.
Although our shirt is wet but we still have to completed our task.
Our team logo :: Five angels and one demond
After we finished to design our shirt, we have to do a lantern with natural material.
That time is already 11.30 pm. we are all very tired.
Luckily, Mr Charles told us that we can completed our last task on tomorrow. Sleeping time. Yeah..
That night, we cannot sleep at all, cause the temperature of the aircorn is too low.
But it was very cool.
To be continue.....
优琳
Aderline
没有评论:
发表评论